Scope of Balaji |
||
Required Machines for plant | Qty | Kw |
Four Bin Inline Batching Plant | 1 | 3.73 |
Material Transfer Conveyor | 1 | 2.24 |
Bi directional Transfer Conveyor | 1 | 2.24 |
Cement screw conveyor with hopper | 2 | 7.46 |
Vibrating Table | 4 | 5.97 |
Planetary colour layer mixer 3.0 | 1 | 3.73 |
Planetary concrete layer mixer 4.0 | 1 | 5.60 |
Auto Water Dispenser | 2 | 1.49 |
Auto admixture Dispenser | 2 | 0.75 |
Mixer platform Stand | 2 | 0.00 |
Panel Board (Controlling system) | 1 | 0.00 |
Concrete auto Dispenser | 1 | 7.46 |
Colour auto Dispenser | 1 | 4.48 |
hydraulic Pallet stacker | 2 | 0.00 |
Mold Demolder | 1 | 15.00 |
Total | 60.13 |
Scope of Customer |
|
Plant Civil work requirments | Value |
PCC Shed for Machines (L x W x H) (feet) | 80 x 40 x 16 |
Cabinet for controlling panels | 15 x 20 x 10 |
Coverd area for 1st day curing | 1500 Sqft |
Raw material storage space | 1500 Sqft |
Mold storage room | 300 Sqft |
Cement storage room | 300 Sqft |
Finished goods storage space | 2000 Sqft |
Labour hatment space | 700 Sqft |
Office and other | 500 Sqft |
water tank | 100 Sqft |
Total | 10000 Sqft |
Wodden pallets 900 x 900 x 16 mm | 900 |
Rubber / PVC / plastic molds | 11000 Nos |
Production Requirments |
|
Required labours for plant | Numbers |
Tractor loader operator | 1 |
Panel bord operator | 1 |
Cement loader | 1 |
Colour dispencer operator | 2 |
Concrete dispencer operator | 2 |
Laveler | 1 |
Unloading from vibrator table | 1 |
mold transportation to cuering area | 1 |
demolding and laquer quoting | 5 |
Total | 15 |
vehical loading unloading extra | 5 |
Air compressor 3.0 Hp | 1 |
Oil for mixer gear boxes ( Liters) | 100 |